Requirements the code prints as figures, as the sample plot sheet or as general notes, without a clause number of their own.
An optional Mediterranean roof may be sloped up to 35 degrees and must stay within the maximum height; enclosed space above the ceiling joist is non-habitable.
Roof can be sloped / pitched up to max. 35 degrees if Mediterranean Architecture is used.
D9.1.7 (Figure 9.14)Modon · Development Control Regulations, Hudayriyat Island East Phase 1 (chapter D9) · p.36 · 23 May 2025
Figure 9.14 states ground-floor and first-floor horizontal roof/slab projections up to 1.5 m front, 1.5 m back and 0.5 m side; MH-PR-03 gives different first-floor figures (see wadeem-x-projection).
D9.1.7 (Figure 9.14)Modon · Development Control Regulations, Hudayriyat Island East Phase 1 (chapter D9) · p.36 · 23 May 2025
Setback-height diagram: front setback ancillary buildings/lightweight structures up to 4.0 m; side and rear setback lightweight structures up to 2.4 m.
D9.1.14Modon · Development Control Regulations, Hudayriyat Island East Phase 1 (chapter D9) · p.44 · 23 May 2025
Residential villa plots allow one use only, Residential - Single Family; the typologies are Small Villa 4 Bed, Medium Villa 5 Bed, Large Villa 6 Bed and Premium Villa 6 Bed only.
D9.1.22Modon · Development Control Regulations, Hudayriyat Island East Phase 1 (chapter D9) · p.54 · 23 May 2025
The sample individual plot sheet (an 800 sqm Large Villa plot) shows maximum plot coverage 70%, maximum total GFA 600 sqm, FAR 0.75, G+1+R and 13.5 m; each plot has its own sheet.
D9.1.25 (sample sheet)Modon · Development Control Regulations, Hudayriyat Island East Phase 1 (chapter D9) · p.66 · 23 May 2025
Modon approves every villa design and issues a no-objection certificate before plans are submitted to DMT/ADM.
Modon to approve all villa designs and issue no objection certificate ( NOC ) prior to submitting plans to DMT/ADM
D9.1.25 (sample sheet)Modon · Development Control Regulations, Hudayriyat Island East Phase 1 (chapter D9) · p.66 · 23 May 2025
The plot developer must carry out an as-built survey and confirm levels against Modon's proposed grading before any design or construction.
The plot developer shall be responsible for conducting an as-built survey and shall confirm all levels as per proposed grading
D9.1.25 Note 4Modon · Development Control Regulations, Hudayriyat Island East Phase 1 (chapter D9) · p.66 · 23 May 2025
All relevant government agency NOCs must be obtained.
All relevant Government Agencies NOCs must be obtained in accordance with their requirements and specifications.
D9.1.25 Note 5Modon · Development Control Regulations, Hudayriyat Island East Phase 1 (chapter D9) · p.66 · 23 May 2025
The owner provides the Transportation Impact Study required by ITC/DMT and obtains plot-level ITC approval.
The Sub-Developer/ Owner must provide the required Transportation Impact Study (TIS) as required by ITC/DMT.
D9.1.25 Note 7Modon · Development Control Regulations, Hudayriyat Island East Phase 1 (chapter D9) · p.66 · 23 May 2025
Plot development must comply with the Estidama Pearl Building Rating System.
The plot development shall comply with the Estidama Pearl Building Rating System as set out by Estidama.
D9.1.25 Note 8Modon · Development Control Regulations, Hudayriyat Island East Phase 1 (chapter D9) · p.66 · 23 May 2025
Each individual floor is limited to 4.5 m.
Maximum Height of each individual floor shall be 4.5m.
D9.1.25 Note 17Modon · Development Control Regulations, Hudayriyat Island East Phase 1 (chapter D9) · p.66 · 23 May 2025
Where the DCR, plot regulation sheets and authority requirements conflict, authority requirements take precedence.
Where a conflict arises between the DCR in this volume, plot regulation sheets, and authority requirements, the authority requirements will take precedence.
A3 User GuideModon · Development Control Regulations, Hudayriyat Island East Phase 1 (chapter D9) · p.11 · 23 May 2025
Directive words: shall = mandatory; should = recommended; may = discretionary.
GlossaryModon · Development Control Regulations, Hudayriyat Island East Phase 1 (chapter D9) · p.3 · 23 May 2025